The First Mysovoy tunnel
| Construction date |
1979 - 1987 |
| Placed into commission |
1989 |
| Constructors |
Tunnel division №16 |
| Length of tunnel |
413,9 m |
| Tunnel section |
122 m2 |
| Tunneling method |
Drill and blast method |
| Lining |
Tunnel: cast-in-place reinforced concrete |
| Location |
East Siberian railway, Nizhneangarsk-Severobaikalsk section |
| Location map |
 |
General information
First Mysovoy tunnel is situated on the section Nizhneangarsk-Severobaikalsk of Baikal-Amur railway. The tunnel is double-track therefore its cross-section is 122 sq m.
Mysovoy tunnels
|