Construction of the Tunnel System 5

Combined (rail and traffic) road from the city of Adler to the mountain resort "Alpika-Servis"
(design, exploration and construction works)

General information on the project

Client: Department of complex reconstruction of railways and construction of rail transport projects ("DKRS")
- the branch of JSC "Russian Railways"

It’s planned to construct the Tunnel System 5 between: 2 nd quarter of 2009 – 3 rd quarter of 2012.

Assembly of the Lovat RME 167SE TBM on the jobsite of the Tunnel System 5
Organization of the Tunnel System 5 construction

The project construction is performed by:

  • Traffic tunnel - JSC "BTS-Gidrostroy"
  • Railway tunnel - "Tunnel Division 18" Ltd
  • Service tunnel - "Tunnel Division 18" Ltd

  • Photo report:

    Construction of the Tunnel System 5 Construction of the Tunnel System 5 Construction of the Tunnel System 5
    Construction of the Tunnel System 5 Construction of the Tunnel System 5 Construction of the Tunnel System 5
    Construction of the Tunnel System 5 Construction of the Tunnel System 5 Construction of the Tunnel System 5

    Photo: Elena Petrova


    « back

    ©Copyright JSC "BAMTONNELSTROY", 2011